Purpose: For any development except heavy production.
Building density: 65%.
Building height: up to 100m.
Located 50 km from the center of Warsaw.
Advantages
- 0.8 km from the site is the main entrance to the Santago Water Park, which has a capacity of 15,000 people/day,
- 4.5 km to the deepest diving pool in Europe, open in 2022.
- 16 km to the place where a logistics hub is being built (air, railway, auto) for 40 million per person per year “CPK”. The planned completion date for stage 1 is 2030.
Plot without communications (only dirt road to asphalt 0.5 km)